Federal / Industrial Division
CEI has performed multiple process systems renovations for federal and
industrial clients. CEI has a great deal of project experience in this
business sector and understands the nuances of functioning in these types
of environments. Below is a list of several projects completed by our
federal / industrial division:
Renovate ARHOC Barrack Building M-4540, Fort Bragg, NC
Renovate ARHOC Barrack Building M-4346, Fort Bragg, NC
Renovate ARHOC Barrack Building M-3019, Fort Bragg, NC
Renovate ARHOC Barrack Building M-3226, Fort Bragg, NC
CEI staff developed mechanical construction documents to renovate and
repair four (4) base barrack building's HVAC, plumbing and fire protection
systems to include new area fan coils, complete retrofit of the building's
Mechanical Equipment Room and re-design of the heating and chilled water
distribution systems.
Replace HVAC System Building 2-1138, Fort Bragg, NC
CEI staff developed mechanical construction documents to replace the HVAC
system for Administration Building 2-1138 including a new building chiller,
boiler integration, heating and chilled water piping systems design, new
air handlers, new VAV boxes and a completely new air distribution systems.
Renovate Simmons Fire Station Bldg P-4539, Fort Bragg, NC
CEI developed HVAC and plumbing systems design for the Simmons Air Field
fire station including new packaged DX units, new air distribution system,
revamped plumbing system and new Truck Apparatus Rooms heating and ventilation
systems.
Renovate CMA Energy Plant, Fort Bragg, NC
CEI assisted in the development of the scope of work for the facility's
planned renovation and provided quality assurance / quality control of
the mechanical (chiller and boiler) system design elements.
Renovate DFAC Building M-4234, Fort Bragg, NC
Renovate DFAC Building H-4842, Fort Bragg, NC
CEI staff developed mechanical construction documents to renovate the
each dining facility's (DFAC) HVAC, plumbing and fire protection systems
to include new area air handling units, exhaust fans, all new sub-floor
piping and integration of the building's new Mechanical Equipment Room
equipment.
J.T. Russell Asphalt Storage System Project, Charlotte, NC
CEI was contracted to provide all mechanical and electrical engineering
design services for the development of a new asphalt storage system to
include piping system, pumping system, controls system, power system
and heat trace system design.
|